-
- 地区
- 全部
-
- 会员级别
- 全部
德国PTL导管进入测试装置
VDE0730导管进入测试仪
进口导管进入试验设备
PTL导管进入测试设备用于确定侧翼在导管条目中的机械强度
参照标准:
VDE 0730 Part 1 / 1972-03 & 21d Fig.7
Standard outfit:
1 cone, bottom part cylindrical, upper part made round.
Design : made of steel, hardened and polished,
nominal conduit diameter: bottom diameter: Article No.:
16,0 mm 15,7 + 0,1 mm F 53.16
19,0 mm 18,7 + 0,1 mm F 53.19
In addition :
Falling Element ,
mass 250 1 g, cylindrical, hardened and polished,
Article No.: F 53.22
Guide Pipe ,
of acrylic glass, with 3 adjustable legs, with release mechanism for a falling height of 150 mm for the falling element,
Article No.: F 53.24
- 询价产品:PTL导管进入测试装置 PTL
- 询价数量: /个
- 联系人:
- 联系电话: